Breadcrumbs
Home
Projects
Projects
This is a list of some of the recent work we have delivered:
- Design of In-House Friction Test Facility (range 100mm – 610mm diameter pipe)
- Design of 2 pad sets (800 pads) for Subsea7 Seven Oceans for Shell BC-10 Project
- Design of 1 pad set (268 pads) for Subsea7 Seven Navica for Vega Project
- Conceptual Design and 3-D Modelling of J-Lay, Rigid and Flex Lay System for Leading Installation Contractors
- Market Assessment and Flex Umbilical Lay System Concept for SBM Normand Installer
- Design, Build and Test of 825 Tonne Pipelay Load Test System for Subsea7 Seven Seas
- Goliath S-Lay System investigation, evaluation, pricing and scheduling for Seatec
- Carousel Upgrade Project for Cable Laying Barge
- Vessel upgrade design study for Technip
Within this Menu is information on projects that Red Marine are involved with.

